Green Car Congress  
Go to GCC Discussions forum About GCC Contact  RSS Subscribe Twitter headlines

« GE & VC Firms Announce $200M Open Innovation Challenge to Accelerate Power Grid Technology Through Open Collaboration | Main | Vorbeck Materials and PNNL to Collaborate to Develop Graphene Product for Li-ion Battery Electrodes; Potential for Rapid Recharge »

Print this post

GE Introduces Smart Grid-Compatible Level 2 Electric Vehicle Charger

14 July 2010

GE introduced the GE WattStation, a Level 2 plug-in vehicle (EV) charger. Using smart grid technology, GE WattStation allows utility companies to manage the impact of electric vehicles on the local and regional grids.

Combining functionality with consumer friendly form from renowned industrial designer Yves Behar, the GE WattStation on average decreases electric vehicle charging time from 12-18 hours to as little as four to eight hours compared to standard charging “level 1”, assuming a full-cycle charge for a 24 kWh battery.

GE WattStation will be commercially available globally in 2011. GE will unveil a specialized home version of the charger later this year.

In addition to the GE WattStation, GE recently announced two new partnerships to advance electric vehicle adoption. In April 2010, Project Get Ready, a non-profit initiative led by Rocky Mountain Institute to help communities prepare for electric vehicles, named GE a technical advisor focusing on design and planning of the local and regional electric grids for electric vehicles.

In May 2010, GE Global Research and Nissan signed a separate three-year Memorandum of Understanding (MOU) to explore new technologies that are needed to build a reliable, dynamic smart-charging infrastructure.

July 14, 2010 in Brief | Permalink | Comments (1) | TrackBack (0)

TrackBack

TrackBack URL for this entry:
http://www.typepad.com/services/trackback/6a00d8341c4fbe53ef0133f24569e6970b

Listed below are links to weblogs that reference GE Introduces Smart Grid-Compatible Level 2 Electric Vehicle Charger:

Comments

The skeptics were complaining that the Smart Grid doesn't exist. Will they have to come up with new excuses now?

Verify your Comment

Previewing your Comment

This is only a preview. Your comment has not yet been posted.

Working...
Your comment could not be posted. Error type:
Your comment has been posted. Post another comment

The letters and numbers you entered did not match the image. Please try again.

As a final step before posting your comment, enter the letters and numbers you see in the image below. This prevents automated programs from posting comments.

Having trouble reading this image? View an alternate.

Working...

Post a comment

Green Car Congress © 2014 BioAge Group, LLC. All Rights Reserved. | Home | BioAge Group