Green Car Congress  
About GCC Contact  RSS Subscribe Twitter headlines
Tweets From the Editor
(different than @GreenCarCongres headlines)

« GM’s Global Electric Vehicle Exec Online in Webchat Weds 4pm EDT | Main | GE & VC Firms Announce $200M Open Innovation Challenge to Accelerate Power Grid Technology Through Open Collaboration »

Print this post

CNG Process for GM Full-Size Vans Nears Completion; PCI Providing the Fuel System

14 July 2010

General Motors has finalized the production process for its Compressed Natural Gas (CNG)-powered Chevrolet Express and GMC Savana full-size vans, allowing the company to deliver fleet customers complete vehicles with a fully integrated and dedicated CNG fuel system starting this fall. (Earlier post.)

The CNG vehicle uses GM’s Vortec 6.0L V8 engine, modified with hardened exhaust valves, and intake and exhaust valve seats for improved wear resistance and durability with gaseous fuel systems. These hardened engines will be assembled into the Chevrolet Express and GMC Savana vans at GM’s Wentzville, Mo. plant.

In addition, GM has chosen Productive Concepts (PCI), an alternative fuels conversion company, to become an integral part of its production. PCI will integrate the CNG fuel delivery and storage system with the hardened engine at its facility in Union City, Ind. PCI also will work to ensure full emissions compliance.

Once the CNG system is integrated into the vans at PCI, they can be shipped to many specialty vehicle manufacturers to have commercial equipment added, or directly to GM dealers.

The vans will meet all Environmental Protection Agency (EPA) and California Air Resources Board (CARB) emission certification requirements, and will be fully compliant with applicable motor vehicle safety standards.

Each CNG Chevrolet Express or GMC Savana van also will be covered by GM’s three-year, 36,000-mile new vehicle limited warranty and five-year, 100,000-mile limited powertrain warranty.

July 14, 2010 in Brief | Permalink | Comments (0) | TrackBack (0)

TrackBack

TrackBack URL for this entry:
http://www.typepad.com/services/trackback/6a00d8341c4fbe53ef0134856a867d970c

Listed below are links to weblogs that reference CNG Process for GM Full-Size Vans Nears Completion; PCI Providing the Fuel System:

Comments

Verify your Comment

Previewing your Comment

This is only a preview. Your comment has not yet been posted.

Working...
Your comment could not be posted. Error type:
Your comment has been posted. Post another comment

The letters and numbers you entered did not match the image. Please try again.

As a final step before posting your comment, enter the letters and numbers you see in the image below. This prevents automated programs from posting comments.

Having trouble reading this image? View an alternate.

Working...

Post a comment

Green Car Congress © 2012 BioAge Group, LLC. All Rights Reserved. | Home | BioAge Group