California ARB posts three new landfill-gas to CNG and LNG LCFS pathways
Integrating traffic simulation and propulsion modeling to estimate EV range for drivers

Houston-Galveston area to deploy 30 battery-electric delivery trucks

The Houston-Galveston Area Council (H-GAC) has partnered with the Center for Transportation and the Environment (CTE) and Smith Electric Vehicles Corporation (Smith Electric) to reduce vehicle emissions from delivery trucks in the Houston-Galveston region. As part of a US Department of Energy sponsored effort, local fleets will replace existing diesel delivery vehicles with all-electric medium- and heavy-duty Smith Newton trucks for daily operations in the Houston-Galveston area.

The US Department of Energy (DOE) National Energy Technology Laboratory (NETL) awarded a grant to H-GAC with an objective of accelerating the introduction and penetration of electric transportation technologies into the cargo transport sector. DOE selected this project to improve local air quality in the Houston-Galveston area, which is currently designated as a National Ambient Air Quality Standards (NAAQS) 8-hour ozone non-attainment area.

The H-GAC Zero Emission Truck project will demonstrate the effectiveness of all-electric delivery vehicles to perform at the same level of operation as similarly sized diesel delivery vehicles while significantly reducing emissions and petroleum use. By deploying 30 zero emission trucks targeted for this program, H-GAC expects to reduce petroleum consumption by over 250,000 gallons of diesel fuel over the 2-year demonstration period. The project will have additional impact with an expected reduction in GHG emissions by 37.5 million tons of carbon equivalents per year and an expected reduction in criteria pollutants of over 2,000 tons per year.

The Smith Newton trucks include the company’s proprietary Smith Power, with variable 40-120 kWh battery pack options; Smith Drive, and Smith Link, an onboard system for monitoring the vehicle’s vital statistics. The vehicles that will be deployed under this grant are based on Smith’s latest production model Series 2000, which has been fully deployed in several locations across the country.

Each Smith Newton will be delivered with an electric vehicle charging station (EVSE). Fully recharging the vehicle will take approximately 6 to 10 hours per night, depending on the size of the battery pack and the state of charge when the vehicle returns to the fleet depot.

The Houston-Galveston Area Council is the region-wide voluntary association of local governments in the 13-county Gulf Coast Planning region of Texas. Its service area is 12,500 square miles and contains more than 6 million people. H-GAC’s mission is to serve as the instrument of local government cooperation, promoting the region’s orderly development and the safety and welfare of its citizens.

Comments

HarveyD

A good first step by Texas. Similar size step by the other 50 States would put a 'small' fleet (1500) of e-trucks on the roads.

The comments to this entry are closed.