NFI expands Class 8 electric truck fleet in Southern California through JETSI; delivery of first 15 of 50 trucks
Study on effects of ammonia-diesel blends in CI engines

Idemitsu launches feasibility study in Japan into clean hydrogen production from waste

Idemitsu Kosan, one of Japan’s leading producers and suppliers of energy, has launched a feasibility study of clean hydrogen production in Japan generated from waste, including municipal waste. The goal is to launch a first hydrogen production facility around 2030 capable of processing 200-300 tons of waste per day.

The study is conducted in collaboration with California-based H-Cycle, which has developed a thermal conversion process using heat and electricity to transform waste into hydrogen with minimal emissions.

100042344

HC is an investee of the Azimuth V Energy Evolution Fund, an investment fund launched by Alberta-based Azimuth Capital Management specializing in technology-enabled energy transition opportunities. Idemitsu has committed to invest in the fund in November 2021.

The hydrogen production now being considered by Idemitsu and HC will use waste discharged in Japan, including municipal waste, as raw material. The system converts these waste products into high value-added clean hydrogen using an integrated gasification and plasma polishing process for which HC holds exclusive rights to deploy in Japan.

By installing this integrated gasification and plasma polishing process as a waste treatment facility in each region to produce hydrogen, it is possible to reduce transportation costs and develop supply bases for hydrogen that is locally produced and consumed.

The clean hydrogen produced is expected to be used not only for industrial and mobility applications, such as fuel cell vehicles, but also as raw material for synthetic fuels.

Aiming to construct an initial hydrogen production facility around 2030 that will process 200–300 tons of waste per day, Idemitsu will going forward seek the cooperation of local governments and determine partner companies for equipment operation and maintenance.

Comments

Nirmalkumar

2030 is long time away. This process if it works will solve two problems of energy and waste.

GdB

Waste to H2 + RECYCLED STUFF!
The RECYCLED STUFF could be made into bricks or other construction material and sequesters the carbon!

The comments to this entry are closed.